View Single Post
  #1  
Old November 21st 06, 10:31 PM posted to microsoft.public.outlook.calendaring
CCT
external usenet poster
 
Posts: 3
Default Changing the default end time

When I drag a task onto a calendar date the end time is always a day after
the start time. In other words, if I drag a task onto 12.13.06 the end time
is 12.14.06. I never have tasks that last more than one day. Is there anway
to change this so the end time is the same day as the start time? Thanks in
advance.
Ads