Changing the default end time
When I drag a task onto a calendar date the end time is always a day after
the start time. In other words, if I drag a task onto 12.13.06 the end time
is 12.14.06. I never have tasks that last more than one day. Is there anway
to change this so the end time is the same day as the start time? Thanks in
advance.
|