Hi All,

I found out that when a task is clicked away as completed that in the
body at the second line there is 12 dashes added, like this:

------------

Now I want to change this. I don't want the dashes added. Is there
anything I can change to prevent this?
The point is that i run a code that checks the dates in my task body
and these line is not a date.
Now I get stuff like:

20060202

------------
20060201
etc...