Thread: Linking events?
View Single Post
  #1  
Old March 9th 06, 06:32 PM posted to microsoft.public.outlook.calendaring
Marc
external usenet poster
 
Posts: 1
Default Linking events?

Good afternoon!

Im am starting to utilize Outlook a lot more for my scheduling but have
run into a bump in the road. I have set schedules based on an original
date. Lets say for example I have 25 events which occur based on a
single date, so the date is may 15th, and events 1, 2, 3 etc accour x
days before May 15 how do I keep these linked to the original date so
that if I change the date all the other events shift too?

Thanks for your help,

Marc

Ads