![]() |
"All Day" Events change to "timed"
I am having an issue with appointments / meetings that I set up as "All Day"
events later changing in Outlook 2007 to "timed" events. The timed event will begin at 1 AM the day of the event and concluding at 1 AM the day after the event is scheduled. This is causing some confusion for me and my co-workers. Is there any solution / suggestion? -- Thanks Steve |
"All Day" Events change to "timed"
Hi Steve
Sounds like the two machines are set as different timezones, either that or daylight saving is checked on one machine and not the other. -- TechieBird http://bwain-dump.blogspot.com "Steve" wrote: I am having an issue with appointments / meetings that I set up as "All Day" events later changing in Outlook 2007 to "timed" events. The timed event will begin at 1 AM the day of the event and concluding at 1 AM the day after the event is scheduled. This is causing some confusion for me and my co-workers. Is there any solution / suggestion? -- Thanks Steve |
All times are GMT +1. The time now is 06:01 AM. |
Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 2.4.0
Copyright ©2004-2006 OutlookBanter.com