![]() |
If this is your first visit, be sure to check out the FAQ by clicking the link above. You may have to register before you can post: click the register link above to proceed. To start viewing messages, select the forum that you want to visit from the selection below. |
|
|
Thread Tools | Search this Thread | Display Modes |
|
#1
|
|||
|
|||
![]()
I have Microsoft Office Ultimate but use Outlook most of the time for
scheduling, events etc. Every time I open it up, it starts the default calendar instead of the one I had saved from a preveious version. (2002) I then have to uncheck the default and check my previous one I had saved or imported. I hope I have made the problem clear as I am tired of having to do this. |
#2
|
|||
|
|||
![]()
Probably the best way to deal with this is to import your old calendar from
the old .PST file into your current calendar and then dump the old one. "cr62bible" wrote: I have Microsoft Office Ultimate but use Outlook most of the time for scheduling, events etc. Every time I open it up, it starts the default calendar instead of the one I had saved from a preveious version. (2002) I then have to uncheck the default and check my previous one I had saved or imported. I hope I have made the problem clear as I am tired of having to do this. |
#3
|
|||
|
|||
![]()
MRN wrote:
Probably the best way to deal with this is to import your old calendar from the old .PST file into your current calendar and then dump the old one. Bad advice. Never import from a PST. -- Brian Tillman [MVP-Outlook] |
#4
|
|||
|
|||
![]()
cr62bible wrote:
I have Microsoft Office Ultimate but use Outlook most of the time for scheduling, events etc. Every time I open it up, it starts the default calendar instead of the one I had saved from a preveious version. (2002) I then have to uncheck the default and check my previous one I had saved or imported. I hope I have made the problem clear as I am tired of having to do this. Can you describe what you are checking and where? If you set the old PST as the delivery location, it will be the default calendar. -- Brian Tillman [MVP-Outlook] |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Thread Starter | Forum | Replies | Last Post |
Outlook 2003 wants to start install every time I start Outlook. | Steve Allen | Outlook - Installation | 2 | August 10th 07 02:42 AM |
Outlook change default start/due dates | Kerrin | Outlook - General Queries | 1 | March 7th 07 08:52 PM |
default start time for meetings | Mick | Outlook - Calandaring | 1 | November 28th 06 09:32 PM |
Wrong default in end and start date and company fields | JRO Mtn Group | Outlook - Using Forms | 4 | July 31st 06 06:19 PM |
Viewing Another's Calendar by Default at Start Up | [email protected] | Outlook - General Queries | 1 | January 11th 06 03:51 AM |